When testing for available voltage to the load, you should
always:
A) set the volt meter to AC volts.
B) place the negative meter lead on ground and the positive meter lead at various points
in the circuit where voltage is expected.
OC) disconnect the connector and use the proper adapter to prevent the connector pins
from being damaged.
D) start the engine to verify each component has charging system voltage available.