Grab Manufacturing Co. purchased a 10-ton draw press at a cost of $172,000 with terms of 5/15, n/45. Payment was made within the discount period. Shipping costs were $5,400, which included $290 for insurance in transit. Installation costs totaled $11,100, which included $4,800 for taking out a section of a wall and rebuilding it because the press was too large for the doorway. The capitalized cost of the 10-ton draw press is: Multiple Choice $177,900. $183,400. $179,900. $184,900.