the only force acting on a 3.5 kg canister that is moving in an xy plane has a magnitude of 7.2 n. the canister initially has a velocity of 3.2 m/s in the positive x direction, and some time later has a velocity of 4.5 m/s in the positive y direction. how much work is done on the canister by the 7.2 n force during this time?