reynoso corporation manufactures titanium and aluminum tennis racquets. reynoso's total overhead costs consist of assembly costs and inspection costs. the following information is available: cost titanium aluminum total cost assembly 500 mach. hours 500 mach. hours $45,000 inspections 350 150 $75,000 2,100 labor hours 1,900 labor hours reynoso is considering switching from one overhead rate based on labor hours to activity-based costing. using activity-based costing, how much inspections cost is assigned to titanium racquets? group of answer choices $30,000. $47,500. $50,000. $52,500.