A flexible pavement is constructed with 5 inches of sand-mix asphaltic wearing surface, 9 inches of dense-graded crushed stone base, and 10 inches of crushed stone subbase. The base has a drainage coefficient of 0.90 while the subbase drainage coefficient is 1.0. Determine the structural number of the pavement.