Value Engineering is a proven management technique that can make valuable contributions to value enhancement and cost reduction in construction industry. Value Engineering is one of the most effective techniques known to identify and eliminate unnecessary costs in product design, testing, manufacturing, construction, operations, maintenance, data, procedures and practices. Value engineering (VE) is frequently carried out by numerous groups of relevant technical or expert team members working together in a systematic manner to follow a multi-job task plan and planned plan of action in order to ensure the implementation of the suggestions. When it comes to completing a VE analysis and ensuring that the suggestions are implemented, the Job Plan is a methodical and planned plan of action. (Source: Rane and Attarde, 2016) Elaborate on the VE Job Plan on key considerations associated with each of the six phases. (25 marks)