Tahle O3 General Cost for the construction of Proiect X a. Evaluate the feasibility of the Project X based on the information noted in Table Q3 at i=10% for 10 years in utilizing the BC-ratio approach based on the following considerations: i. In considering the benefit only ii. In considering both the benefit and disbenefit