Owners of a nationwide motel chain are considering locating a new motel in Snyder, Arkansas. The complete cost of building a 150-unit motel (excluding furnishings) is $5 million; the firm estimates that the furnishings in the motel must be replaced at a cost of $1,875,000 every 5 years. Annual operating and maintenance cost for the facility is estimated to be $125,000. The average rate for a unit is anticipated to be $55/day. A 15-year planning horizon is used by the firm in evaluating new ventures of this type; a terminal salvage value of 20% of the original building cost is anticipated; furnishings are estimated to have no salvage value at the end of each 5-year replacement interval; land cost is not to be included. Determine the break-even value for the daily occupancy percentage based on a MARR of (a) 0%, (b) 10 %, (c) 15 %, and (d) 20%. (Assume that the motel will operate 365 days/year.)