A line has the operating characteristics listed below. - The line runs 3 shifts a day, and the line is expected to operate for 7.0 hours each shift. - Downtime per day is 34 minutes (note that this is per day, not per shift). - Equipment is designed to run at 160 packages per minute. - 187,700 packages are produced per day, of which 180,000 are acceptable. Determine the OEE metrices of the line. If it less than 90% suggest an improvement.