Geotechnical engineer is required to carry out preliminary and detailed site investigation of a project before proceed with design and construction stage. As a geotechnical engineer
a) Define five (5) the purpose of conducting site investigation
b) Determine five (5) purposes of visual inspection (field trip) of site before conducting detail site investigation.
c) Discuss three (3) activities of site investigation
d) Identify the difference between disturbed and undisturbed of soil samples