contestada

Due to a recent change by Microsoft you will need to open the XLMiner Analysis ToolPak add-in manually from the home ribbon. Screenshot of ToolPak A manufacturing company has been selected to assemble a small but important component that will be used during the construction of numerous infrastructure projects. The company anticipates the need to assemble several million components over the next several years. Company engineers select three potential assembly methods: Method A, Method B, and Method C. Management would like to select the method that produces the fewest number parts per 10,000 parts produced that do not meet specifications. It may also be possible that there is no statistical difference between the three methods in which case the lowest cost method will be selected for production. While all parts are checked before leaving the factory, the best method will reduce the number of parts that need to be recycled back into the production process. To test each method, six batches of 10,000 components are produced using each of the three methods. The number of components out specificaion among the three methods. After conducting the analysis report the findings to the management team. Open spreadsheet a. Compute the sum squares between treatments (assembly methods). b. Compute the mean square between treatments (to 1 decimal if necessary). C. Compute the sum squares due to error. d. Compute the mean square due to error (to 1 decimal if necessary).