Determine the work content (standard time) for the union assembly by dividing it into 3 elements as follows:
A. pick up of nut and pipe parts from bins, dipping of both parts in lubricants.
Break point : Start of reaching for both nut and pipe.
B. Threading together of the nut and pipe parts till tightened.
Break point: Start if threading motion.
C Inspection Both ends of union, and drop off.
Break point: Start of Inspection.
Use an average standard performance for three complete cycles and a 10% allowance across all elements. Average rating for each of the elements average 3 complete cycle is assumed at standard performance.