Exercise 2-13 (Algo) Departmental Predetermined Overhead Rates [LO2-1, LO2-2, LO2-4] White Company has two departments, Cutting and Finishing. The company uses a job-order costing system and computes a predetermined overhead rate in each department. The Cutting Department bases its rate on machine-hours, and the Finishing Department bases its rate on direct labor-hours. At the beginning of the year, the company made the following estimates: Department Cutting Finishing 69,000 Direct labor-hours Machine-hours 6,700 60,200 1,000 Total fixed manufacturing overhead cost $ 390,000 $ 4.00 $488,000 0 Variable manufacturing overhead per machine-hour Variable manufacturing overhead per direct labor-hour 0 $3.75 Required: 1. Compute the predetermined overhead rate for each department. 2. The job cost sheet for Job 203, which was started and completed during the year, showed the following: Department Cutting Finishing 18 Direct labor-hours 5 Machine-hours 87 Direct materials $760 $ 370 Direct labor cost $ 120 $ 432 Using the predetermined overhead rates that you computed in requirement (1), compute the total manufacturing cost assigned to Job 203. 3. Would you expect substantially different amounts of overhead cost to be assigned to some jobs if the company used a plantwide predetermined overhead rate based on direct labor-hours, rather than using departmental rates? Answer is complete but not entirely correct. Complete the question by entering your answers in the tabs given below. Required 1 Required 2 Required 3 Using the predetermined overhead rates that you computed in requirement (1), compute the total manufacturing cost assigned to Job 203. (Round your intermediate calculations and final answer to 2 decimal places.) Total manufacturing cost $ 2,636.17 < Required 1 Required 3 >