A government library, L., required a "repository system" to store and make accessible very large amounts of highly varied material over long periods of time. This "repository system will be integrated with the current system of L. An outside organization, C, built a repository system to stere and manipulate complex digital material. Nobody built the sub-systems needed to organize, validate, and to lead material into the repository. L. expected the repository system to include these sub-systems. C considered the sub-systems separate from the repository system. a. How this problem could have been avoided? b. What is the type of this project, corrective, adaptive, enhancement or reengineering? Justify your answer. c. Who are the stakeholders of this project? d. What are the main quality attributes of the system to be developed?