statements are true one or Determine if the following 1) In a -false, router piplined Noc microarchitecture, route computation, virtual channel allocation, and switch allocation. can be completed in a single cycle using prediction (T/F) and speculation 2) Breaking cyclic dependencies during routing is primarily meant to avoid livelocks (T/F) turn model is more restrictive than 3) West - first routing XY dimension order routing (7/F) 4). The credit based flow control scheme has higher Control traffic over head than the Xon/xoff scheme.CT/F) 3 a In majority of Nols, flit size and phit size are the same, (IF) b) Parket switching is used for applications that requir guaranteed Qos requirements (T/F) 7) Photonic interconnects are good candidates to replace to cal inter connects (T/P) 8) . The network Interface Ts responsible for data packet-zation protocol conversion and supe synchronization. (TIF) 1