pwhite3194 pwhite3194 07-01-2024 Mathematics contestada Under the revised ABC system, what is the activity cost driver rate for the supervision activity? a) Not provided b) The activity cost driver rate is fixed. c) Depends on the level of supervision activity. d) Varies with the type of product.