brighteye4916 brighteye4916 09-01-2024 Engineering contestada A 1:12 scale model is to be built to study the flow over a spillway. The flow rate in the prototype 180 m/s. The flow rate in the model (m3/s) should be most nearly (a) 0.36 (b) 1.25 (c) 8.25 (d) 15