Which of the following conditions are relevant for subtotals in planning view?
1) Total value can be added before or after the selected attribute.
2) Total number of attributes that can use subtotals in the planning view can be restricted.
3) Only attribute-based totals can be added.
4) The values of the attribute-based total at the highest attribute level in the planning level can be changed.