Assume the actual cost to manufacture 120 bats is $9,060.00. Compute the total cost variance and identify it as favorable or unfavorable. (Indicate the effect of the variance by selecting favorable, unfavorable, or no variance.)
Actual Cost _______ ________
Budgeted standart cost _______ ________
Total cost Variance _______ ________