Mudboy9616 Mudboy9616 16-01-2024 Physics contestada The speed of the mass at point A is 3.2 m/s, and at point B, it is 6.0 m/s. How much work is done on the mass between A and B by the force of friction? a. 48 J b. 72 J c. 96 J d. 120 J