A plot of 40m x 90m is required to have a subdivision to construct some houses. You are requested to draw your subdivision by using a software or manually and calculate the below:
• The number of the plots that you propose to subdivide.
• The coverage area of each plot.
• The front setback, side setback, and rear setback of each plot
• You need to consider having at least three different plot areas.
