What is the approximate optimum hourly production rate for a wheeled backhoe filling hauling units? Struck capacity for the bucket is 6 loose cubic feet and the bucket fill factor is 110%. The cycle time is 2 minutes, the soil type is moist loam with 25% swell factor.