mcadoo4414 mcadoo4414 06-03-2024 Business contestada If the predetermined overhead rate is 200% of direct labor cost and if direct labor cost is estimated to be $512,000, which of the following amounts is equal to $1,024,000? a) $256,000 b) $512,000 c) $1,024,000 d) $2,048,000