contestada

Using both the high-low method data calculated above and the regression data calculated above, please estimate total labor cost at 130,000 direct labor hours.

A) Estimate using the high-low method
B) Estimate using regression analysis
C) Average the estimates from both methods
D) Cannot be determined without further information