What is the underallocated or overallocated manufacturing overhead cost at the end of 2023, considering an allocated cost of $230,000 and an actual cost of $213,500?
A) $16,500 overallocated
B) $16,500 underallocated
C) $96,500 overallocated
D) $96,500 underallocated