6. Create two scenarios to compare the costs for standard consultants and consultants with change certification as follows:
a. In the Scenario Manager, add two scenarios using the data shown in bold in Table 1 below.
b. The changing cells for both scenarios are the nonadjacent cells B11 and B14.
c. Close the Scenario Manager without showing any of the scenarios.
Table 1: Organizational Change Scenario Values

Values Scenario 1 Scenario 2
Scenario Name Standard Certified
Variable_Cost_Per_Hour_Change (B11) 380 420
Total_Fixed_Cost_Change (B14) 380,000 335,000