Respuesta :
If 2/3 ton of gravel covers 3/4 of a driveway, you need to divide 2/3 divided by 3 to find how much is needed for 1/4 of the driveway.
Steps:
1. 2/3 divided by 3 = 2/3 * 1/3. So 2/9.
2. Add 2/3 plus 2/9= 8/9 ton of gravel to cover the whole driveway.
Answer: 8/9
Hope this helped, and good luck with any future problems
Answer:
Give this person brainliest above you said you need two people :)
Step-by-step explanation: