Respuesta :
Answer:
The work has Been done is 2503.12 J .
Step-by-step explanation:
Formula for workdone is given by
Workdone = Force × Distance
As w = mg
Where m is the mass , g is the acceleration of gravity .
As given
Ben Pumpiniron applies an upward force to lift a 129-kg barbell to a height of 1.98 m at a constant speed.
m = 129 kg
g = 9.8 m / s²
Putting in the w =mg
w = 129 × 9.8
= 1264.2 kg m / s²
(As given in the question force is constant thus force doing the work is equal to weight .)
Thus
Force = 1264.2 kg m / s²
Workdone = Force × Distance
= 1264.2 × 1.98
= 2503.12 J (Approx)
Therefore the work has Been done is 2503.12 J .
The amount of work that has been done is 2,503.116Joules
Workdone and energy
The Work done for calculating workdone is expressd as:
W = Fd
F = mg
Hence;
W = mgh
m is the mass = 129kg
g is the acceleration due to gravity = 9.8m/s^2
h is te height = 1.98m
Determine the workdone
W = 129 * 9.8 * 1.98
W = 2,503.116Joules
Hence the amount of work that has been done is 2,503.116Joules
Learn more on workdone here: https://brainly.com/question/8119756