I Need the Answer for this question.
PLZ PLZ PLZ

If both machines are working at once, 200 tshirts (100 in each machine) could be made in 100 minutes, if 200 shirts can be made in machine 1 in 50 minutes, it will take 25 minutes to make 100. machine b takes 150 minutes per each 200, 150 divided by two is 75. 75 + 25 = 100 minutes
It would work better just to use machine one and take 50
minutes, but i dont think thats an answer choice.
edit: i think from the choices your answer would be: 37.5 as if both machines run at once more tshirts can be made