Carbondale Casting produces cast bronze valves on a 10-person assembly line. On a recent day, 160 valves were produced during an 8-hour shift. a) Calculate the labor productivity of the line. b ) John Goodale, the manager at Carbondale, changed the layout and was able to increase production to 180 units per 8-hour shift. What is the new labor productivity per labor-hour? c) What is the percentage of productivity increase?