Answer: Maximize the Objective Function
2x + 4y = z
Subject to:
Machine L 7x + 9y ≤ 154
Machine LL 3x + 3y ≤ 66
Step-by-step explanation:
From problem statement :
Let :
x units of product A per shift
y units of product B per shift
Profit on each A unit 2$
Profit on each B unit 4$
Product A needed time in machine L 7 min and 3 min in machine LL
Poduct B needed time in machine L 9 min and 3 min in machine LL
Available time 154 min machine L 66 min machine LL (by shift )
Then: Objective function to maximize z
z = 2x + 4y
Constraints
Machine L 7x + 9y ≤ 154
Machine LL 3x + 3y ≤ 66