QueenDarbane6019 QueenDarbane6019 08-11-2019 Social Studies contestada A plot below the lower control limit on the range chart: (I) should be ignored since lower variation is desirable. (II) may be an indication that process variation has decreased. (III) should be investigated for assignable cause.