Answer:
$34.12
Explanation:
Fixed Overhead Rate = Estimated total fixed manufacturing overhead ÷ estimated the labor-hours for the upcoming year
= $1,760,220 ÷ 66,000
= $26.67 per labor-hour
Predetermined Overhead Rate:
= Variable Overhead Rate + Fixed Overhead Rate
= $7.45 per labor-hour + $26.67 per labor-hour
= $34.12