Tile & Grout (T&G) contracts to resurface the insides of the pools at Water World Park. T&G knows that without the resurfacing, Water World will have to delay its seasonal opening. T&G does not perform as promised. As consequential damages, Water World can recover​
A) ​the cost of new pools.
B) ​the difference between T&G's price and the eventual cost of resurfacing.
C) ​the loss of profit from the delayed opening.
D) ​nothing.