Answer:
Work done by the system = 4545 J
Explanation:
The expression for the calculation of work done is shown below as:
[tex]w=-P\times \Delta V[/tex]
Where, P is the pressure
[tex]\Delta V[/tex] is the change in volume
From the question,
[tex]\Delta V[/tex] = 45 - 15 L = 30 L
P = 1.5 atm
[tex]w=-1.5\times 30\ atmL[/tex]
Also, 1 atmL = 101 J
So,
[tex]w=-1.0\times0.75\times 101\ J=-4545\ J[/tex] (negative sign implies work is done by the system)
Work done by the system = 4545 J