As per the typology developed by Shenhar and Dvir, system scope ranged from _____ that included projects that dealt with building a single component, to _____ that included a wide dispersal of interactive systems and subsystems.

Respuesta :

Answer: assembly projects , array projects

Explanation: System Scope describes the current systems that the required application package is expected to replace or interface with. As per the typology developed by Shenhar and Dvir, system scope ranged from assembly projects that included projects that dealt with building a single component, to array projects that included a wide dispersal of interactive systems and subsystems. The typology of Shenhar and Dvir characterized projects based on the attributes of technological uncertainty and complexity of scope.