Answer:
237.96%
Explanation:
The computation of the predetermined overhead rate is shown below:
Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor cost)
= ($237,247) ÷ ($99,700)
= 237.96%
By dividing the total estimated manufacturing overhead from the estimated direct labor cost we can get the percentage of direct labor cost or predetermined overhead rate