Answer:
B) $56,750
Explanation:
Direct materials cost $27,500
Direct labor cost$13,000
As manufacturing overhead rate is based on a percentage of direct labor cost so dividing the manufacturing overheads by direct labor costs we get =$1,050,000,/$840,000= 1.25
Multiplying this rate with the actual overheads we get 1.25* 13000 = $16250
The total job cost would be = Direct materials cost+Direct labor cost + budgeted Overheads = $27,500 +$13,000+$16250= $56,750