Answer:
Throughput (manufacturing cycle) time = 7.6
Manufacturing Cycle Efficiency Time= 26%
Non Value Added Time = 22.3
Delivery Cycle Time = 24.3
Explanation:
Throughput time or cycle time is the average amount of time required to convert raw materials into finished goods ready to be shipped to customers. It includes the time required for material handling , production processing , inspection and packaging. The formulae are given below for different times.
a) Throughput (manufacturing cycle) time = Inspection Time + Process Time + Move Time + Queue time
Throughput (manufacturing cycle) time = 0.6+2.0+ 1.3+3.7= 7.6
b) Manufacturing Cycle Efficiency Time= Value added Time/ Manufacturing Cycle time
Manufacturing Cycle Efficiency Time= Process Time/ Processing Time + Inspection Time + Move Time + Wait time
Manufacturing Cycle Efficiency Time= 2/ 7.6= 26.32% = 26%
Non Value added times are those which are not necessity in the manufacturing process for example wait time etc.
c) Non Value Added Time= Wait time + Inspection Time + Move Time + Queue Time
Non Value Added Time=16.7 + 0.6+ 1.3+ 3.7= 22.3
d) Delivery Cycle Time= NonValue Added time + Value Added Time (Process Time)
Delivery Cycle Time= 22.3 + 2.0= 24.3