One conveyor belt can move 1000 boxes in 9 minutes. Another can move 1000 boxes in 11 minutes. If another conveyor belt is added and all three are used, the boxes are moved in 3 minutes. How long would it take the third conveyor belt alone to do the same job?

Respuesta :

Answer:

It would take 7.62 minutes for the third conveyor belt alone to do the same job

Step-by-step explanation:

The together rate is the sum of each separate rate.

In this question:

First conveyor: Rate of 1/9.

Second: Rate of 1/11.

Third: Rate of 1/x.

Total: 1/3

So

[tex]\frac{1}{9} + \frac{1}{11} + \frac{1}{x} = \frac{1}{3}[/tex]

[tex]\frac{11x + 9x + 99}{99x} = \frac{1}{3}[/tex]

[tex]\frac{20x + 99}{99x} = \frac{1}{3}[/tex]

[tex]3(20x + 99) = 99x[/tex]

[tex]60x + 297 = 99x[/tex]

[tex]39x = 297[/tex]

[tex]x = \frac{297}{39}[/tex]

[tex]x = 7.62[/tex]

It would take 7.62 minutes for the third conveyor belt alone to do the same job