tyrasia1212 tyrasia1212 06-09-2020 Mathematics contestada • The labor and material for renovating a building totaled $25,475. Of this amount, 70% went for labor and the balance for materials. Determine: (a) the labor cost, and (b) the material cost. What’s the labor cost and the material cost?