The following graph shows the time required to install fencing of different lengths. 1 1 2 2 3 3 4 4 5 5 20 20 40 40 60 60 80 80 100 100Time (hours)Length of fencing (meters) Which statements about the graph are true? Choose all answers that apply:


Answer:
The answer is B
Step-by-step explanation:
"The point shows (4,60) shows that it takes 4 hours to install 60m of fencing"
I did this on khan too
hope this helps :)