Respuesta :
Answer:
Refer to the attachment for calculations.[tex]\Huge {\uparrow}[/tex]
Hence Sujata is late by 2 seconds.
Graph:-
[tex]\setlength{\unitlength}{2.5mm}\begin{picture}(10,10)\linethickness{0.45mm}\put(20,20){\vector(1,0){18}}\put(20,20){\vector(-1,0){18}}\put(20,20){\vector(0,1){18}}\put(20,20){\vector(0,-1){18}}\multiput(19.35,6)(0,2){15}{\line(1,0){1.3}}\multiput(6,19.35)(2,0){15}{\line(0,1){1.3}}\put(20,20){\circle*{1}}\qbezier(20,20)(25,21)(27,36)\qbezier(20,20)(15,22)(13,36)\end{picture}[/tex]
