m0s
contestada

A contractor bought 10.8 ft to the second power of sheet metal. he has used 3.7ft to the scound power so far and has ​$113.60 worth of sheet metal remaining. The equation 10.8x - 3.7x = 113.6 represents how much sheet metal is remaining and the cost of the remaining amount. How much does sheet metal cost per square​ foot?