Answer:
1.6hours
Step-by-step explanation:
let let the slower pump take x hours
then the faster pump will take 1.25x hours to pump the raft
The combined work rate is 5 hours
The expression for the combined work rate is
1/x+1/1.25x= 1/5
solve for x we have
1.25+x/1.25x= 1/5
cross multiply we have
5(1.25+x)= 1.25x
6.25+5x=1.25x
collect like terms
6.25+5x-1.25x=0
6.25+3.75x=0
3.75x=-6.25
divide both sides by 3.75
x=-6.25/3.75
x=-1.6 hours
x= 1.6hours