The time required to complete a job varies inversely as the number of people working. It took 4 hours for 7 electricians to wire a building. How long would it have taken 3 electricians?

A. 1 hour 43 minutes
B. 5 hours 15 minutes
C. 7 hours 30 minutes
D. 9 hours and 20 minutes

Respuesta :

Answer:

b ok so here me out if you divide 7 by 4 you get 1.75 times 100 =175 ok divide that by 60 you get 2 hours, ok so 2 times 3 is 6, now we add the minutes back on  were yo get 2.73 ok now 8.73 but there's only 60 minutes in a hour so its 9.13 so we add on the extra seconds witch is .7 so its 9.20. btw this might be completely wrong sorry if it was!

Answer:

9 hours and 20 minutes: b

Step-by-step explanation:

4*60=240

7x240=1680

1680/3=560

560= 9 h 20 m