Answer:
Cutting Department:
Rate variance = 6380*(10.9-11) = -638 Favorable
Time variance = 11*(6380-25000*0.25) = 1430 Unfavorable
Total direct labor cost variance = (6380*10.9)-(25000*11*0.25) = 792 Unfavorable
Sewing Department:
Rate variance = 9875*(11.12-11) = 1185 Unfavorable
Time variance = 11*(9875-25000*0.4) = -1375 Favorable
Total direct labor cost variance =(9875*11.12)-(25000*11*0.4) = -190 Favorable