Answer:
400/9 weeks to empty the lake
Step-by-step explanation:
Let t = the time to empty the lake
The rate of water being released = 1/16
The rate of water being replenished = 1/25
rate times time = amount of work done
1/16(t) = the amount water that is being released
1/25(t) = the amount of water the river is putting into the lake
amount being released - amount being replenished = 1 empty lake
t/16 - t/25 = 1
25t - 16t = 16(25)
9t = 16(25)
t = 16(25)/9 = 400/9 weeks to empty the lake