Answer:
The work done is 13680.8 J.
Explanation:
The work done can be calculated as follows:
[tex] W = F*d [/tex]
Where:
F: is the force
d: is the displacement = 40 m
The force acting on the boulder is given by:
[tex] F = mgsin(\theta) [/tex]
Where:
m: is the mass = 100 kg
g: is the acceleration due to gravity = 10 m/s²
θ: is the angle = 20°
Then, the work is:
[tex] W = mgsin(\theta)d = 100 kg*10 m/s^{2}*sin(20)*40 m = 13680.8 J [/tex]
Therefore, the work done is 13680.8 J.
I hope it helps you!