Based on the distance between locations, the total distance moved in the week will be 6,700 meters.
Assuming that Departments X, Y and Z are in areas I, II and III respectively. The following will be true:
This can be found by multiplying the loads carried across departments by the distance between the locations of these departments.
= ( (Loads from X to Y x distance of X and Y) + (Loads from X to Z x Distance of X and Z)) + ( (Loads from Y to X x distance of X and Y) + (Loads from Y to Z x Distance of Y and Z)) + ( (Loads from Z to Y x distance of Z and X) + (Loads from Z to Y x Distance of Y and Z))
= ( (0 x 10) + 80 x 20)) + ( (30 x 10) + (150 x 10) ) + ( (100 x 20) + 130 x 10) )
= 1,600 + 1,800 + 3,300
= 6,700 meters
In conclusion, the total distance would be 6,700 meters.
Find out more on minimizing costs at https://brainly.com/question/1380316.